Abstract
The feasibility of a harbour project, which involves dredging of an access channel, may to a large extent depend on the future maintenance dredging in the channel. It is therefore important to be able to calculate sedimentation in dredged channels with sufficient accuracy. In 1974 and 1975 the Danish Hydraulic Institute (DHI) carried out a study of the most feasible access channel to Warri Port situated in the Western Niger Delta, Nigeria. Two alternative entrances were studied and in conclusion it was recommended to improve the existing access channel through Escravos Entrance.
Authors retain copyright and grant the Proceedings right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Proceedings.