[1]
1992. HYDRAULIC APPROACH TO DETERMINING OPTIMUM INTERVAL OF DISCHARGE SITES OF BARGE IN CONSTRUCTING RUBBLE FOUNDATION OF DEEP WATER BREAKWATER. Coastal Engineering Proceedings. 1, 23 (Jan. 1992). DOI:https://doi.org/10.9753/icce.v23.%p.