[1]
2011. CAUSES OF BACK-SILTATION IN THE NORTH PASSAGE OF YANGTZE ESTUARY AND EVALUATION OF THE ENGINEERING MEASURES. Coastal Engineering Proceedings. 1, 32 (Jan. 2011), management.47. DOI:https://doi.org/10.9753/icce.v32.management.47.