[1]
2011. CONSTRUCTION OF TWO NEW BREAKWATERS AT OSTEND LEADING TO AN IMPROVED HARBOUR ACCESS. Coastal Engineering Proceedings. 1, 32 (Feb. 2011), structures.53. DOI:https://doi.org/10.9753/icce.v32.structures.53.