[1]
2020. DO WE NEED PRE-STORM SURVEYED BATHYMETRY FOR OPERATIONAL EROSION FORECASTING? EVALUATION OF REPRESENTATIVE AND SYNTHETIC BATHYMETRY ALTERNATIVES. Coastal Engineering Proceedings. 36v (Dec. 2020), sediment.13. DOI:https://doi.org/10.9753/icce.v36v.sediment.13.