(1)
INITIAL GAP IN BREAKOUT OF HALF-BURIED SUBMARINE PIPE DUE TO WAVE ACTION. Int. Conf. Coastal. Eng. 1994, 1 (24). https://doi.org/10.9753/icce.v24.%p.