(1)
CAUSES OF BACK-SILTATION IN THE NORTH PASSAGE OF YANGTZE ESTUARY AND EVALUATION OF THE ENGINEERING MEASURES. Int. Conf. Coastal. Eng. 2011, 1 (32), management.47. https://doi.org/10.9753/icce.v32.management.47.