(1)
CONSTRUCTION OF TWO NEW BREAKWATERS AT OSTEND LEADING TO AN IMPROVED HARBOUR ACCESS. Int. Conf. Coastal. Eng. 2011, 1 (32), structures.53. https://doi.org/10.9753/icce.v32.structures.53.