(1)
MODELING ON THE ESTUARINE TURBIDITY MAXIMUM OF YANGTZE ESTUARY BEFORE AND AFTER THE REGULATION WORKS USING Z-MODEL. Int. Conf. Coastal. Eng. 2014, 1 (34), currents.46. https://doi.org/10.9753/icce.v34.currents.46.