RESULTS OF RIVER MOUTH TRAINING ON THE CLARENCE BAR, NEW SOUTH WALES, AUSTRALIA. (1976). Coastal Engineering Proceedings, 1(15), 100. https://doi.org/10.9753/icce.v15.100