CAUSES OF BACK-SILTATION IN THE NORTH PASSAGE OF YANGTZE ESTUARY AND EVALUATION OF THE ENGINEERING MEASURES. (2011). Coastal Engineering Proceedings, 1(32), management.47. https://doi.org/10.9753/icce.v32.management.47