“ABOUT THE ESTIMATION OF THE NUMBER OF DAYS WITH FAVORABLE METEOROLOGICAL AND OCEANOGRAPHICAL CONDITIONS FOR ENGINEERING OPERATIONS ON THE SEA COAST AND IN ESTUARIES”. 1954. Coastal Engineering Proceedings 1 (5): 29. https://doi.org/10.9753/icce.v5.29.