“OPTIMUM SIZE OF DISTORTED RIPPLE TRAIN FOR THE CONTROL OF CROSS-SHORE SEDIMENT TRANSORT”. 1998. Coastal Engineering Proceedings 1 (26). https://doi.org/10.9753/icce.v26.%p.