“CAUSES OF BACK-SILTATION IN THE NORTH PASSAGE OF YANGTZE ESTUARY AND EVALUATION OF THE ENGINEERING MEASURES”. 2011. Coastal Engineering Proceedings 1 (32): management.47. https://doi.org/10.9753/icce.v32.management.47.