“CAUSES OF BACK-SILTATION IN THE NORTH PASSAGE OF YANGTZE ESTUARY AND EVALUATION OF THE ENGINEERING MEASURES” (2011) Coastal Engineering Proceedings, 1(32), p. management.47. doi:10.9753/icce.v32.management.47.