[1]
“MODELING ON THE ESTUARINE TURBIDITY MAXIMUM OF YANGTZE ESTUARY BEFORE AND AFTER THE REGULATION WORKS USING Z-MODEL”, Int. Conf. Coastal. Eng., vol. 1, no. 34, p. currents.46, Oct. 2014, doi: 10.9753/icce.v34.currents.46.