“SUBSTRUCTURE DESIGN OF THE NEW MYSTIC PIER NO. 1, BOSTON”. Coastal Engineering Proceedings, vol. 1, no. 3, Jan. 1952, p. 16, https://doi.org/10.9753/icce.v3.16.