THE ADVANCE ON CHINA COASTAL ENGINEERING
Proceedings of the 32nd International Conference
PDF

Supplementary Files

High-resolution version of keynote paper

Keywords

china coastal engineering
technology progress
Yangtze Estuary
hollow-block mound breakwater
Pearl River Estuary
Oujiang Estuary
Dalian Port
Caofeidian Port
Tianjin Port
Qingdao Port
Yangshan Port
Ningbo-Zhoushan Port
Guangzhou Port
Bridges

How to Cite

Xie, S., Zuo, Q., & Dou, X. (2011). THE ADVANCE ON CHINA COASTAL ENGINEERING. Coastal Engineering Proceedings, 1(32), keynote.1. https://doi.org/10.9753/icce.v32.keynote.1

Abstract

An overall introduction is made in this paper to the progress of coastal engineering in the mainland of China during the last two decades, covering the regulation engineering and training effects of the deep navigation channel of the Yangtze River estuary and the Pearl River estuary; the coast protection standards, beach protection and reclamation engineering as well as various types of structures; ports construction and development; the key technology achievements in hydrodynamics of the silty and sand coasts and radial sandbanks; and the main technological development of several large-size cross-sea bridges. It is pointed out that China needs to improve the coastal hydrodynamic monitoring system, to solve the key problems in the coastal engineering construction under severe environment conditions, and to strengthen the management and ecological protection of coastal zones.
https://doi.org/10.9753/icce.v32.keynote.1
PDF

References

Chen, Z.C, Zuo, Q.H., Dou, X.P. and Zhao, X.D 2005. The research on sedimentation and designed waves of the Yangtze Estuary Deep Navigation Channel Regulation Project, Report of Nanjing Hydraulic Research Institute, NO. RC0528. (in Chinese)

China Communications Water Transportation Planning and Design Institute Co. Ltd. 2007. New structure of comb type breakwater, Symposium on Port and Waterway Engineering Technology Development, China Communications Press, 96-102. (in Chinese)

CCCC First Harbor Consultants Co. Ltd. 2007. Development of Covered Type Sheet Pile Wharf, Symposium on Port and Waterway Engineering Technology Development, China Communications Press, 103-111. (in Chinese)

Cheng, Z.K. 2005. Planning and construction of Yangshan deepwater port project, Proceedings of 3rd International Conference on Asian and Pacific Coasts, Jeju-do, Korea, 49-66.

Dou, X.P. 2009. Advance on estuarine sediment transport in China, Proceedings of 14th China Coastal-Ocean Engineering, China Ocean Press, Taiyuan, China, 1-7. (in Chinese)

PMid:19782117

Fan, Q.J. 2010. Causes of back-siltation in the north passage of Yangtze estuary and evaluation of the engineering measures, ICCE2010, Shanghai, China.

Liu, N. et al. 2008. Symposium on Storm Surge Disaster Prevention and Seawall Engineering, China Water Power Press. (in Chinese)

Li, Y.C. 2007. Interaction between waves and perforated caisson breakwater, Proceedings of 4th International Conference on Asian and Pacific Coasts, Nanjing, China, 1-16.

Lu, P.D. 2009. Stability of artificial island project at radial sand ridge in South Yellow Sea, Proceedings of 14th China Coastal and Ocean Engineering, China Ocean Press, Taiyuan, China, 772-778. (in Chinese)

Lu Z.D., et al. 2006. Key technologies for Hangzhou Bay Bridge, China Civil Engineering Journal, 39(6), 79-87. (in Chinese)

Lu, Z.M., et al. 2009, Relationship between Qingcaosha reservoir construction and the Yangtze Estuary comprehensive regulation, Water & Waster Water Engineering, 35(1), 55-58. (in Chinese) MOC of China. 2006. National coastal port layout (in Chinese). MWR of China. 2008. Code for design dike project (SL435-2008), China Water Power Press. (in Chinese)

Tianjin Port (Group) Co. Ltd. 2007. Breakwater with Penetrated Caisson Type Substructure, Symposiums of Port and Waterway Engineering Technology Development, 116-121. (in Chinese)

Xin, W.J. 2010a. Analysis and evaluation on siltation measurement in Guangzhou Port sea channel project, Report of Nanjing Hydraulic Research Institute, No. RC10026. (in Chinese)

Xin, W.J., et al. 2010b. Impact on the waterway of the Pearl River Estuary by Hong Kong-Zhuhai-Macao Bridge, Report of Nanjing Hydraulic Research Institute, No. RC10060. (in Chinese)

Xu, M., et al. 2001. Formation of equilibrium beach profile of the abandoned yellow river delta coast in north Jiangsu, China Ocean Engineering, 15(1), 139-146.

Xu, Q., et al. 2009. Physical model test for the 2nd phase navigation channel training of Oujiang Estuary, Report of Nanjing Hydraulic Research Institute, No. RC09062. (in Chinese)

Xu, X., et al. 2009, Physical model test of sediment transport for Caofeidian dig-in basin and breakwater channel, Report of Nanjing Hydraulic Research Institute, No. RC0914. (in Chinese)

Yang, H. 2009. Regulation and effect on siltation in outer channel of Huanghua harbor (in Chinese), Journal of Waterway and Harbor, 30(4), 233-240.

Yangtze Estuary Waterway Administration Bureau. 2007. Set of technologies of Yangtze Estuary deep waterway training project, Symposium on Port and Waterway Engineering Technology Development, China Communications Press, 1~14. (in Chinese)

You, Q.Z., et al. 2009. Sutong Bridge--a cable-stayed bridge with main span of 1,088 meters, Engineering Science, 30(3), 14-19. (in Chinese)

Authors retain copyright and grant the Proceedings right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Proceedings.