A FUNDAMENTAL STUDY ON CONSTRUCTION SCHEME FOR RUBBLE FOUNDATION OF DEEP WATER BREAKWATER FROM HOPPER BARGES
PDF

Keywords

barge
hopper barge
construction scheme
rubble foundation
breakwater
deep water breakwater

How to Cite

Matsumi, Y. (1990). A FUNDAMENTAL STUDY ON CONSTRUCTION SCHEME FOR RUBBLE FOUNDATION OF DEEP WATER BREAKWATER FROM HOPPER BARGES. Coastal Engineering Proceedings, 1(22). https://doi.org/10.9753/icce.v22.%p

Abstract

This study aims to establish the effective construction scheme of the rubble mounds which are constructed by discharging a large amount of rubble from hopper barges. The numerical simulation technique is developed to estimate the spatial geometry of individual rubble mound discharged from a hopper barge. The effective distance between the discharge sites of the barge which makes the uneven property of the mound surface a minimum is discussed in connection with the change in the spatial geometry of the discharged rubble, the water depth and the direction of barge allocation.
https://doi.org/10.9753/icce.v22.%25p
PDF
Authors retain copyright and grant the Proceedings right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Proceedings.