RICHARDS BAY NORTH BREAKWATER - REPAIR OF A ROUNDHEAD: MONITORING, MODEL TESTING, DESIGN AND CONSTRUCTION
PDF

Keywords

breakwater
Richards Bar

roundhead
breakwater repair
model test
breakwater design
breakwater construction

How to Cite

Phelp, D., McClarty, A., & Bartels, A. (1996). RICHARDS BAY NORTH BREAKWATER - REPAIR OF A ROUNDHEAD: MONITORING, MODEL TESTING, DESIGN AND CONSTRUCTION. Coastal Engineering Proceedings, 1(25). https://doi.org/10.9753/icce.v25.%p

Abstract

The head section of the north breakwater, at the entrance to the Port of Richards Bay, has suffered some damage since its construction in 1973. This paper briefly discusses the changes in the design conditions, the first unsuccessful repair in 1986/87, using 15t dolosse, the annual photographic monitoring results showing the rates of damage to the roundhead since then, and the model testing of various repair options, using available spare 20t and 30t dolosse. Finally the construction of the optimal repair, carried out in 1996, using a heavy duty mobile crane (with 48m boom reach) and DGPS positioning, is described. Construction was still in progress at the time of publishing this paper.
https://doi.org/10.9753/icce.v25.%25p
PDF
Authors retain copyright and grant the Proceedings right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Proceedings.