Abstract
The paper describes the monitoring program that has been set up for the hydraulic loads on the Eastern Scheldt Barrier. The strategy for the measurements will be discussed in detail. The results of the measurements, that have been performed yet, will be presented. These results are discussed only briefly, because the evaluation of the results has not been completed yet.